Vertiv
SKU: VP4NA0A4
Overview
Manufacturer-verified compatible cameras, recorders, mounts, accessories, and licenses for this product. Adjust quantities and add the entire bundle to your cart in one click.
Overview
Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.
The VP4NA0A3 is a vertically mounted, unit-level monitored rack PDU rated for 80A at 277/480V WYE (3-phase), delivering up to 66.4kW of power distribution across 30 Saf-D-Grid Series 400 outlets. Designed for high-density data center and industrial power distribution environments where per-outlet monitoring matters — this is the configuration to reach for when you need visibility at the outlet level on a high-current, three-phase circuit without eating up U-space in a fully loaded cabinet. At 72 inches long and 2.5 inches wide, VP4NA0A3 mounts vertically in the zero-U space of a standard rack, keeping all 42U of cabinet space available for compute or networking gear.
Designed for Vertiv's Vertiv rack power distribution ecosystem. The 277/480V WYE input suits facilities with high-voltage three-phase branch circuits — typical in purpose-built data center PDU deployments, colocation environments, and large industrial installations. The 30 Saf-D-Grid Series 400 outlets support locking Saf-D-Grid connectors; verify that your downstream equipment (PDUs, power strips, or direct device connections) terminates in Anderson Saf-D-Grid Series 400 plugs before specifying this unit — mismatched connectors are the most common installation error on high-voltage PDU deployments. The 80A input requires a dedicated 100A-rated branch circuit breaker per NEC 80% continuous load rules. Consult your power distribution planning guide to confirm branch circuit sizing and verify the facility's UPS or transformer output matches the 277/480V WYE input spec.
Vertical zero-U mounting keeps the 72-inch length along the rack rail — confirm rack depth and vertical channel clearance before ordering, as some two-post or shallow-depth racks cannot accommodate a 72-inch PDU run. Unit weight is 19 lbs unloaded; factor cable bundle weight when planning mounting hardware. Input connection is high-voltage three-phase — installation must be performed by a licensed electrician. No toolless outlet connection: Saf-D-Grid locking connectors require deliberate insertion and twist to seat. Review Vertiv PDU accessories for compatible input whips and mounting brackets specific to your cabinet configuration.
Manufacturer-verified compatible cameras, recorders, mounts, accessories, and licenses for this product. Adjust quantities and add the entire bundle to your cart in one click.
Looking for more Vertiv products? Shop the full Vertiv catalog →
Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.
Fixed scope • Fixed price