Product images are provided for reference and may not represent the exact model, configuration, or included components.

Overview

SKU: APDU9981EU3X968
Condition: New
Write a Review 33% OFF

APC Rack PDU 9000 Switched Zerou 11.0KW 230V (21) C13 & (3) C19 3.5M Cord - APDU9981EU3X968

APC by Schneider Electric APDU9981EU3X968 Switched 0U Rack PDU 11kW 230VOverviewThe APDU9981EU3X968 is a zero-rack-unit (0U) switched power distributi…

$4,060.00 $2,710.99 SAVE $1349
Ships same business day
In stock

Quantity:

Adding to cart… The item has been added
Compatibility guidance available for your deployment
Senior specialists for pre and post-sales support
Authorized sourcing and documentation support
Shipping and lead-time confirmation before install

Laura Bennett, IPSD Senior Specialist

Talk to Laura

200+ hrs training • U.S - based

Senior Specialist • 877-277-7147

APC Rack PDU 9000 Switched Zerou 11.0KW 230V (21) C13 & (3) C19 3.5M Cord - APDU9981EU3X968

$4,060.00
$2,710.99

Overview

SKU: APDU9981EU3X968
Condition: New

No Bots, Just Experts

Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

APC by Schneider Electric APDU9981EU3X968 Switched 0U Rack PDU 11kW 230V

Overview

The APDU9981EU3X968 is a zero-rack-unit (0U) switched power distribution unit designed for high-density rack environments running 230V three-phase infrastructure. Delivering 11kW of load capacity across 24 individually switchable outlets — (21) IEC 60320 C13 and (3) IEC 60320 C19 — this PDU gives operations teams remote per-outlet control without consuming a single rack unit of usable equipment space. It ships with a 1.82m input cord terminated in an IEC 60309 16A 3P+N+PE plug, sized for standard European three-phase 16A distribution circuits at 400V input.

For data centers, server rooms, and rack power distribution deployments where remote reboot capability and granular load visibility matter, the APDU9981EU3X968 pairs switched-outlet control with dual-stack network management (SNMP and Redfish) over a 10/100/1000BASE-T interface — giving you protocol options whether your infrastructure management layer runs traditional NMS tooling or modern Redfish-compliant orchestration.

Key Features

  • 11kW / 16A Load Capacity at 230V: Handles up to 11,000 VA across 24 outlets — enough headroom for a fully populated 1U/2U server rack without approaching the 16A input circuit limit. Running at 80% of rated current (12.8A practical ceiling) leaves buffer for inrush during simultaneous boot sequences.
  • 24 Switched Outlets (21×C13 + 3×C19): C13 slots cover standard 1U/2U server PSUs and network gear; the three C19 outlets handle higher-draw devices like GPU servers, storage arrays, or UPS bypass loads. Per-outlet switching means you can remotely reboot a hung server without touching the rack or cycling power to adjacent equipment.
  • 0U Vertical Mounting: The vertical side-mount profile keeps all 42U (or equivalent) of usable rack depth available for revenue-generating equipment. For dense deployments where every rack unit counts, eliminating a 1U or 2U horizontal PDU footprint is a real operational advantage.
  • SNMP + Redfish Network Management: Dual-protocol support over Gigabit Ethernet means this unit fits both legacy NMS environments (SNMP v1/v2c/v3) and modern Redfish-based data center orchestration platforms. You're not locked into a proprietary management stack or forced to replace your monitoring tooling to gain visibility.
  • IEC 60309 16A 3P+N+PE Input Plug: The industrial-grade input connector is the standard for European three-phase distribution panels and PDU whips — direct compatibility with typical raised-floor and in-rack power infrastructure. No adapters, no field-wiring surprises at commissioning.
  • 400V Three-Phase Input: Three-phase input at 400V (line-to-neutral 230V per phase) is the delivery mechanism for European and international data center power distribution. Each outlet presents 230V to connected equipment — correct for standard IEC-standard servers and networking gear without step-down transformers.
  • 1.82m Input Cord: The cord length positions the PDU to reach floor-level or overhead PDU whip terminations in standard 600mm or 800mm deep cabinets. Verify your rack's power feed entry point before ordering — 1.82m covers most configurations but may be marginal in deeper or unusually routed installations.
  • 10/100/1000BASE-T Network Port: Full Gigabit connectivity to your management network. In environments where management VLANs carry significant monitoring traffic, having a Gigabit uplink avoids the bottleneck that 10/100 ports introduce when polling dozens of PDUs in parallel.
  • UL / cUL Listed + VDE Certified: UL listing covers North American deployments; VDE certification covers European markets. FCC Part 15 Class A and EN 55022 Class A address conducted and radiated emissions compliance for IT environments — relevant if your facility must meet electromagnetic compatibility standards.
  • 5–95% RH Operating Range, 0–10,000 ft Altitude: The humidity and altitude envelope covers most data center and server room environments, including facilities at moderate elevation. Not rated for condensing humidity or industrial outdoor environments — confirm your mechanical plant maintains non-condensing conditions.

Integration and Compatibility

The APDU9981EU3X968 integrates into data center infrastructure management (DCIM) platforms and NMS tools via SNMP, and into Redfish-compliant orchestration environments via its dual-protocol management stack. The 10/100/1000BASE-T management port connects to your management VLAN using standard Cat5e/Cat6 patch cabling. APC's EcoStruxure IT platform and APC Network Management Cards are the native management ecosystem, though the Redfish interface broadens compatibility with third-party DCIM and automation tooling.

For UPS and power infrastructure planning, this PDU draws from a 16A three-phase circuit — coordinate with your facilities team on available panel capacity before deploying multiple units in a single cabinet. Combining two PDUs in an A+B feed configuration provides outlet-level redundancy for dual-PSU servers, which is the standard resilience pattern for mission-critical racks.

The C13/C19 outlet mix is compatible with the vast majority of 1U–4U rack servers, blade chassis, and networking equipment shipping IEC standard power supplies. The three C19 outlets support higher-draw devices up to their local circuit limits — match your connected device PSU ratings against the PDU's 16A total input budget before finalizing outlet assignments.

What's in the Box

  • 1× APC Rack PDU 9000 Switched 0U (APDU9981EU3X968) with 1.82m input cord
  • 1× Installation guide
  • 1× Rack mounting brackets
  • 1× Safety guide

Frequently Asked Questions

Q: What input plug does the APDU9981EU3X968 use, and what circuit does it require?

A: It uses an IEC 60309 16A 3P+N+PE plug — the standard European three-phase industrial connector. It requires a 400V three-phase circuit rated at 16A. The practical operating ceiling is 80% of that rating (12.8A) for continuous loads.

Q: Is the APDU9981EU3X968 rack-mountable in a standard 19-inch rack?

A: It is a 0U unit designed for vertical side-mounting inside the rack cabinet, not horizontal rack-rail mounting. It ships with rack mounting brackets for side installation and does not consume any rack units (0U form factor).

Q: What network management protocols does the APDU9981EU3X968 support?

A: It supports SNMP and Redfish over a 10/100/1000BASE-T Ethernet port. This dual-protocol support covers both traditional NMS platforms (SNMP-based) and modern Redfish-compliant data center orchestration environments.

Q: How many outlets does the APDU9981EU3X968 provide, and what types?

A: It provides 24 switched outlets: (21) IEC 60320 C13 and (3) IEC 60320 C19. All outlets are individually switchable for remote per-outlet power control and reboot capability.

Q: What certifications does the APDU9981EU3X968 carry?

A: It holds UL and cUL listings (North America), VDE certification (Europe/Germany), and FCC Part 15 Class A compliance. It also meets EN 55022 Class A, EN 55024, EN 61000-3-2, and EN 61000-3-3 EMC standards.

Q: What is the total load capacity of the APDU9981EU3X968?

A: The rated load capacity is 11,000 VA (11kW) at 230V output, with a 16A maximum input current. Plan actual deployment loads at no more than 80% of rated capacity (approximately 8.8kW continuous) to maintain safe operating margins.

Marty Allison
Marty Allison

The APDU9981EU3X968 is purpose-built for European three-phase rack environments where remote outlet-level control and zero rack-unit footprint are non-negotiable. The 11kW / 16A rating at 400V three-phase input covers a fully populated mixed-load rack — servers on C13, high-draw compute or storage on the three C19 outlets — with enough headroom to stay comfortably under the 80% continuous load ceiling. What makes this unit operationally relevant is the combination of per-outlet switching and dual SNMP/Redfish management on a Gigabit port: you can remotely reboot a hung node without touching the rack or cycling adjacent equipment, and you can do it from whatever management platform your team already runs.

Technical Highlights:

  • 0U Vertical Form Factor: Side-mounts inside the cabinet with the included brackets — preserves every rack unit for equipment. In a 42U cabinet shared between compute and networking, recovering even 1U translates directly to deployable capacity.
  • SNMP + Redfish Dual Management: SNMP covers legacy NMS and traditional DCIM integrations; Redfish covers modern orchestration and automation stacks. You're not forced to choose one protocol or maintain a separate management appliance to bridge the two.
  • 24 Switched Outlets (21×C13 + 3×C19): The outlet mix handles the realistic load profile of a populated rack — standard IEC server PSUs on C13, higher-draw GPU or storage devices on C19 — without requiring a secondary PDU for outlet-type mismatches.

Deployment Considerations:

  • The 1.82m input cord is adequate for most 600–800mm deep cabinets with overhead or underfloor power feeds, but measure your specific cable route before commissioning — short by even 20cm and you're rewiring the whip or sourcing an extension, neither of which is a good day-of-install discovery.
  • This unit is rated for 16A input max; the IEC 60309 plug mates to a 16A three-phase circuit. If your facility panel runs 32A whips, you'll need the appropriate step-down outlet or a different PDU model — do not attempt to adapt the plug.

Deploy the APDU9981EU3X968 in European colocation or enterprise data center cabinets where facilities infrastructure is already provisioned for 400V three-phase 16A feeds and the operations team needs remote reboot capability without dispatching hands to the floor. It's particularly well-suited to mixed-load racks combining 1U servers, network switches, and one or two high-draw appliances where the C13/C19 outlet split maps cleanly to the installed equipment.

Specifications
Color: Black
Product Or Component Type: PDU
Pdu Type: Switched
Cord Length: 1.82 m
Number Of Cables: 1
Provided Equipment: Installation guide Rack mounting brackets Safety guide
Input Voltage: 400 V 3 phases
Dimensions: 1792 mm
Output Voltage: 230 V
Weight: 7 kg
Mounting Location: Side
Mounting Preference: No preference
Input Plug Type: IEC 60309 16 A 3P + N + PE
Mounting Mode: Not rack-mountable
Rack Units: 0U
Mounting Position: Vertical
Communication Port Protocol: SNMP Redfish
In] Rated Current: 16 A
Max Line Current: 16 A
Input Current Limits: 16 A
Load Capacity: 11000 VA
Network Frequency: 50/60 Hz
Outlet Type And Quantity: 21 IEC 60320 C13 3 IEC 60320 C19
Communication Network Type: 10/100/1000BASE-T
Product Certifications: cUL listed FCC part 15 class A UL listed VDE
Standards: EN 55022 class A EN 55024 EN 61000-3-2 EN 61000-3-3 ICES-003
Relative Humidity: 5…95 %
Operating Altitude: 0...10000 ft
Ambient Air Temperature For Storage: -25…65 °C
Storage Relative Humidity: 5…95 %
Storage Altitude: 0…15240 m
Unit Type Of Package 1: PCE
Number Of Units In Package 1: 1
Package 1 Height: 200.2 cm
Package 1 Width: 11.4 cm
Package 1 Length: 16.5 cm
Package 1 Weight: 8.95 kg
Q&A
Reviews
Have Questions?

RELATED PRODUCTS

System Design, Deployment & Technical Support

Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

Fixed scope • Fixed price

System Design Assistance

  • Get help validating product compatibility
  • Coverage requirements
  • Storage planning and deployment architecture before you buy.
Request Design Help

Deployment & Configuration Support

  • Access fixed-scope support for rollout planning
  • User setup guidance
  • Migration and system standardization across single-site or multi-site deployments
View Support Services

Guides, Tools & Calculators

  • PoE requirements
  • Storage retention
  • Camera selection and deployment methodology
Open Technical Resources