Image coming soon
Product images are provided for reference and may not represent the exact model, configuration, or included components.

No Bots, Just Experts

Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

Vertiv AS6B0NCYGNNXLKB 10kVA Scalable UPS with Extended Battery Runtime

Overview

The Vertiv AS6B0NCYGNNXLKB is a 10kVA / 9.0kW hardwire UPS configured for deployments that need meaningful runtime at full load — 21 minutes at 10kVA, 53 minutes at half load — without requiring a separate battery cabinet at day one. That runtime profile makes it the right starting point for mid-size data closets, edge compute rooms, and critical infrastructure nodes where a 5-minute bridge buys nothing but a longer reboot queue. For broader Vertiv power protection options, explore the Vertiv UPS and power catalog.

The AS6B0NCYGNNXLKB sits in a scalable family that tops out at 20kVA / 18.0kW. If load growth is on the roadmap, you can expand the system to 20kVA without replacing the core unit — a meaningful capital planning advantage over fixed-capacity alternatives.

Key Features

  • 10kVA / 9.0kW Capacity: Sized for mid-density critical loads — enough headroom for a standard edge rack running NVRs, PoE switches, and servers without pushing the unit above 80% utilization, which is where UPS efficiency and battery life degrade fastest.
  • 21-Minute Full-Load Runtime: At 10kVA (full load), the AS6B0NCYGNNXLKB delivers 21 minutes of runtime — enough to execute a controlled shutdown sequence or survive most utility interruptions without touching the load. Compare: the otherwise-identical AS6B0NCWGNNXLKB provides only 10 minutes at full load, and the base AS6B0NCVGNNXLKB a mere 5 minutes. If runtime is the selection criterion, this configuration is the top of the 10kVA tier.
  • 53-Minute Half-Load Runtime: Running a lightly loaded rack or a single critical device at half capacity? Runtime more than doubles to 53 minutes — useful for overnight edge sites where a technician can't respond within the first 20 minutes of an outage.
  • Scalable to 20kVA / 18.0kW: The platform architecture lets you grow from 10kVA to 20kVA without replacing the chassis. For deployments where load growth is anticipated over a 3–5 year horizon, buying into the scalable platform now avoids a forklift upgrade later.
  • Hardwire Input (L-L-N-G): Input connects directly to your electrical panel via line-line-neutral-ground hardwire — no NEMA plug to lose, no adapter dependency. This is the correct choice for permanent infrastructure installations where a plug-in connection would be a code or facilities violation.
  • Hardwire Output with Optional PODs: Output is also hardwire-native, with optional POD (Power Output Distribution) modules available for branching to multiple downstream circuits. This gives facility managers the flexibility to distribute protected power across a rack or room without running everything back to a single outlet strip.
  • Family Positioning — Runtime Differentiation: Within the 10kVA / 20kVA-scalable tier, Vertiv offers four configurations varying only in battery size: AS6B0NCVGNNXLKB (5 min full-load), AS6B0NCWGNNXLKB (10 min), and this unit at 21 min. If your site needs more than 21 minutes at full load, step up to the 15kVA or 20kVA variants in the same family rather than adding external battery cabinets.

Integration and Compatibility

The hardwire I/O architecture integrates directly into commercial and industrial electrical infrastructure without requiring specialized receptacles. The optional POD output modules allow downstream distribution to match your rack layout or room topology. For installations pairing this unit with network video recorders, access control panels, or edge compute nodes, the 21-minute runtime at full load provides a reliable shutdown window without requiring a generator handoff. If your facility runs a managed PoE switch infrastructure, factor total switch draw into your load calculation — a fully loaded 48-port PoE switch can pull 400–740W alone.

Sizing note: the AS6B0NCYGNNXLKB is rated at 9.0kW real power at a 0.9 power factor. If your load mix includes motor loads or older power supplies with lower power factors, derate accordingly. The UPS and power protection category includes additional Vertiv configurations if this unit falls short of your load or runtime requirement.

Frequently Asked Questions

Q: What is the full-load runtime of the AS6B0NCYGNNXLKB?

A: The AS6B0NCYGNNXLKB delivers 21 minutes of runtime at full load (10kVA / 9.0kW) and 53 minutes at half load (5kVA / 4.5kW).

Q: How does this model differ from the AS6B0NCWGNNXLKB and AS6B0NCVGNNXLKB?

A: All three are 10kVA units scalable to 20kVA with identical hardwire I/O. The difference is battery size and runtime: AS6B0NCVGNNXLKB provides 5 minutes at full load, AS6B0NCWGNNXLKB provides 10 minutes, and the AS6B0NCYGNNXLKB provides 21 minutes. Choose based on how much bridge time your shutdown or failover procedure requires.

Q: Can this UPS be expanded beyond 10kVA without replacing the unit?

A: Yes. The AS6B0NCYGNNXLKB is scalable to 20kVA / 18.0kW within the same platform family, accommodating load growth without a full system replacement.

Q: What type of electrical connection does the AS6B0NCYGNNXLKB require?

A: The unit uses a hardwire input configured as L-L-N-G (line-line-neutral-ground), connecting directly to your electrical panel. There is no NEMA plug — this is a permanent hardwire installation.

Q: What output connection options are available?

A: Output is hardwire-native, with optional POD (Power Output Distribution) modules available to branch protected power to multiple downstream circuits or devices.

Q: Is the AS6B0NCYGNNXLKB appropriate for a mixed IT and surveillance load?

A: At 9.0kW real power, yes — provided your total load stays within 80% of capacity (roughly 7.2kW) for optimal efficiency and battery longevity. Itemize all connected loads including NVRs, switches, servers, and any PoE infrastructure before finalizing sizing.

Specifications
Model Name: AS6B0NCYGNNXLKB
Power Capacity: 10kVA / 9.0kW
Scalable To: 20 / 18.0
Input Type: Hardwire (L-L-N-G)
Output Type: HardwireOptional PODs
Full Load Runtime: 21 min
Half Load Runtime: 53 min
freight: 622.68
Q&A
Reviews

Vertiv 10KVA APS MAX 20KVA 21M BAT - AS6B0NCYGNNXLKB

$27,509.00
$19,261.99

RELATED PRODUCTS

Save $11,079.01
Vertiv 20KVA APS MAX 20KVA 5M BAT - AS6D0NCJGNNXLKB
Add to Cart The item has been added

Vertiv AS6D0NCJGNNXLKB

Vertiv 20KVA APS MAX 20KVA 5M BAT - AS6D0NCJGNNXLKB

20kVA (18kW) uninterruptible power supply (UPS) module designed for scalable, high-density power protection in enterprise data centers and critical

    Usually Ships in 2-3 Weeks Free shipping over $499
    $36,708.00 $25,628.99 Save $11,079.01
    The item has been added Add to quote
    $36,708.00 $25,628.99 Save $11,079.01
    Save $11,079.01 Add to cart Add to quote
    Save $9,102.01
    Vertiv APS 10KVA Scalable to 20KVA N+1 - AS4B0NCVGNNXLKB
    Add to Cart The item has been added

    Vertiv AS4B0NCVGNNXLKB

    Vertiv APS 10KVA Scalable to 20KVA N+1 - AS4B0NCVGNNXLKB

    Lithium-Ion battery module designed to extend the operational life and reduce the total cost of ownership for compatible Vertiv UPS systems

      Usually Ships in 2-3 Weeks Free shipping over $499
      $30,192.00 $21,089.99 Save $9,102.01
      The item has been added Add to quote
      $30,192.00 $21,089.99 Save $9,102.01
      Save $9,102.01 Add to cart Add to quote

      System Design, Deployment & Technical Support

      Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

      Fixed scope • Fixed price

      System Design Assistance

      • Get help validating product compatibility
      • Coverage requirements
      • Storage planning and deployment architecture before you buy.
      Request Design Help

      Deployment & Configuration Support

      • Access fixed-scope support for rollout planning
      • User setup guidance
      • Migration and system standardization across single-site or multi-site deployments
      View Support Services

      Guides, Tools & Calculators

      • PoE requirements
      • Storage retention
      • Camera selection and deployment methodology
      Open Technical Resources