Product images are provided for reference and may not represent the exact model, configuration, or included components.

No Bots, Just Experts

Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

Vertiv AS6C0NCJGNNXLKB 15kVA Scalable Online UPS with Extended Battery Runtime

Overview

The Vertiv AS6C0NCJGNNXLKB is a 15kVA / 13.5kW hardwired online UPS designed for data centers, server rooms, and critical infrastructure deployments where you need guaranteed runtime headroom and a growth path without replacing hardware. At 15kVA today and scalable to 20kVA / 18.0kW as your load grows, this unit sits in the middle of the Vertiv APS MAX series, bridging the gap between entry-level 5–10kVA units and the full 20kVA top of the line. The hardwire input (L-L-N-G) and hardwire output with optional POD expansion make it a wiring-room-friendly option for facilities that don't want outlet strips running critical loads.

Key Features

  • 15kVA / 13.5kW Usable Power: The 90% power factor means nearly all rated kVA translates to usable watts — relevant when you're sizing for dense server or UPS power loads where kVA ratings can be misleading if you assume 1:1 with kW.
  • Scalable to 20kVA / 18.0kW: If your load grows after installation, the AS6C0NCJGNNXLKB platform supports expansion to 20kVA without pulling the unit and buying new hardware. That's a meaningful capital deferral when infrastructure refresh cycles run 5–7 years.
  • 16-Minute Full-Load Runtime: At 100% load (13.5kW), you get 16 minutes of battery backup — enough time for an orderly shutdown sequence or for a generator to come online in most facility transfer scenarios. Compare this to the AS6C0NCWGNNXLKB at the same kVA rating, which delivers only 5 minutes at full load; the battery configuration in this model is specifically chosen for extended runtime.
  • 41-Minute Half-Load Runtime: At 50% load (approximately 6.75kW), runtime stretches to 41 minutes. In practice, most server rooms run at 40–60% of rated UPS capacity, so this runtime figure is often more operationally relevant than the full-load number. Plan your shutdown and generator start sequences against this figure.
  • Hardwire Input (L-L-N-G): Line-to-line-to-neutral-to-ground hardwire connection eliminates the weak point of plug-and-socket connections at this power class. At 15kVA, hardwire is the right architecture — outlet-based connections at this load level introduce unnecessary failure points and are code-problematic in many jurisdictions.
  • Hardwire Output with Optional PODs: Output is also hardwired, with optional Power Output Distribution (POD) modules available to distribute power downstream. This keeps the distribution architecture flexible — you can run directly hardwired to your PDU infrastructure or add PODs to serve multiple load groups from a single UPS chassis.

Integration and Compatibility

The AS6C0NCJGNNXLKB fits into facilities that already use hardwire distribution infrastructure — it's not a plug-in unit. Coordinate with your electrical contractor on the L-L-N-G feed before specifying this in a quote. The optional POD accessories from Vertiv allow downstream distribution expansion without replacing the UPS itself, which is worth documenting in your BOM if the end-user anticipates load growth. For deployments pairing this UPS with networked surveillance or network infrastructure, review your power management architecture to confirm the UPS capacity covers not just servers but also switches, NVRs, and edge compute loads — those are commonly underestimated in initial sizing. If you're sizing for a camera-heavy deployment, a PoE switch stack pulling 2–4kW can materially affect your runtime calculations at this UPS tier.

Frequently Asked Questions

Q: What is the full-load runtime of the AS6C0NCJGNNXLKB?

A: At full load (15kVA / 13.5kW), the AS6C0NCJGNNXLKB delivers 16 minutes of battery runtime. At half load (approximately 6.75kW), runtime extends to 41 minutes.

Q: Can the AS6C0NCJGNNXLKB be expanded beyond 15kVA?

A: Yes. The unit is scalable up to 20kVA / 18.0kW within the same platform, providing a growth path without full hardware replacement.

Q: What type of electrical connection does the AS6C0NCJGNNXLKB require?

A: The AS6C0NCJGNNXLKB requires a hardwire input connection in L-L-N-G (Line-Line-Neutral-Ground) configuration. It is not a plug-in unit — electrical contractor involvement is required for installation.

Q: How does the AS6C0NCJGNNXLKB differ from the AS6C0NCWGNNXLKB?

A: Both are 15kVA / 13.5kW units scalable to 20kVA with the same hardwire I/O, but their battery configurations differ. The AS6C0NCJGNNXLKB delivers 16 minutes at full load and 41 minutes at half load; the AS6C0NCWGNNXLKB delivers only 5 minutes at full load and 16 minutes at half load. Choose the AS6C0NCJGNNXLKB when extended runtime is a requirement.

Q: What output distribution options are available for the AS6C0NCJGNNXLKB?

A: The unit supports hardwire output as standard, with optional Power Output Distribution (POD) modules available for downstream distribution to multiple load groups.

Karl Wilson
Karl Wilson

The AS6C0NCJGNNXLKB's 16-minute full-load runtime at 15kVA / 13.5kW is the spec that separates it from the otherwise-identical AS6C0NCWGNNXLKB in the Vertiv APS MAX lineup. That 11-minute difference at full draw isn't cosmetic — it's the difference between an orderly automated shutdown and a hard crash when your generator transfer switch is slow or your facility's genset hasn't been serviced recently.

Technical Highlights:

  • 16-min / 41-min runtime pair: Full-load runtime of 16 minutes covers most generator transfer scenarios; the 41-minute half-load figure is what you'll quote to a client whose actual utilization runs 50% of rated capacity — which is most real-world server rooms.
  • Scalability to 20kVA / 18.0kW: The platform supports expansion without hardware swap. If a client is at 13kW today and anticipates growth, this is the right starting point — the next step up in the family (AS6D0NCJGNNXLKB) jumps to 20kVA / 18.0kW and can't scale further.
  • Hardwire L-L-N-G I/O with optional PODs: At 15kVA, hardwire is the correct architecture. The POD option keeps distribution flexible for facilities that want centralized UPS with distributed outlet groups.

Deployment Considerations:

  • Hardwire input means this unit requires a licensed electrician for commissioning — budget the labor cost and lead time into your project schedule, especially in jurisdictions with permit requirements for electrical work above a certain amperage threshold.
  • The scalability ceiling is 20kVA / 18.0kW — if your load projection exceeds that within the product's expected service life, you're better served quoting the AS6D model family from the start rather than planning a second UPS purchase mid-lifecycle.

This unit is the right specification for a mid-size data room or edge compute facility running 8–12kW of active load today with documented growth plans — the extended battery runtime and 20kVA scalability ceiling make it a defensible spec for a 5-year infrastructure plan without over-purchasing at the 20kVA baseline price.

Specifications
Model Name: AS6C0NCJGNNXLKB
Power Capacity: 15kVA / 13.5kW
Scalable To: 20 / 18.0
Input Type: Hardwire (L-L-N-G)
Output Type: HardwireOptional PODs
Full Load Runtime: 16 min
Half Load Runtime: 41 min
freight: 657.94
Q&A
Reviews

Vertiv 15KVA APS MAX 20KVA 16M BAT - AS6C0NCJGNNXLKB

$31,103.00
$21,775.99

RELATED PRODUCTS

Save $11,079.01
Vertiv 20KVA APS MAX 20KVA 5M BAT - AS6D0NCJGNNXLKB
Add to Cart The item has been added

Vertiv AS6D0NCJGNNXLKB

Vertiv 20KVA APS MAX 20KVA 5M BAT - AS6D0NCJGNNXLKB

20kVA (18kW) uninterruptible power supply (UPS) module designed for scalable, high-density power protection in enterprise data centers and critical

    Usually Ships in 2-3 Weeks Free shipping over $499
    $36,708.00 $25,628.99 Save $11,079.01
    The item has been added Add to quote
    $36,708.00 $25,628.99 Save $11,079.01
    Save $11,079.01 Add to cart Add to quote

    System Design, Deployment & Technical Support

    Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

    Fixed scope • Fixed price

    System Design Assistance

    • Get help validating product compatibility
    • Coverage requirements
    • Storage planning and deployment architecture before you buy.
    Request Design Help

    Deployment & Configuration Support

    • Access fixed-scope support for rollout planning
    • User setup guidance
    • Migration and system standardization across single-site or multi-site deployments
    View Support Services

    Guides, Tools & Calculators

    • PoE requirements
    • Storage retention
    • Camera selection and deployment methodology
    Open Technical Resources