UPS & Power Management
Showing Results for UPS & Power Management
-
Vertiv
SKU: AP2-20-A-100
Vertiv APM2 20KVA 208V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-20-A-100
In stock · Ships same business day$50,499.00 $34,627.99 Save $15,871.01 -
Vertiv
SKU: AP2-30-A-100
Vertiv APM2 30KVA 208V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-30-A-100
In stock · Ships same business day$54,960.00 $37,686.99 Save $17,273.01 -
Vertiv
SKU: AP2-30-C-100
Vertiv APM2 30KVA 480V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-30-C-100
In stock · Ships same business day$58,648.00 $40,215.99 Save $18,432.01 -
Vertiv
SKU: AP2-40-A-100
Vertiv APM2 40KVA 208V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-40-A-100
In stock · Ships same business day$50,358.00 $34,531.99 Save $15,826.01 -
Vertiv
SKU: AP2-40-C-100
Vertiv APM2 40KVA 480V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-40-C-100
In stock · Ships same business day$89,823.00 $61,592.99 Save $28,230.01 -
Vertiv
SKU: AP2-60-A-100
Vertiv APM2 60KVA 208V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-60-A-100
In stock · Ships same business day$64,043.00 $43,915.99 Save $20,127.01 -
Vertiv
SKU: AP2-60-C-100
Vertiv APM2 60KVA 480V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-60-C-100
In stock · Ships same business day$79,830.00 $54,740.99 Save $25,089.01 -
Vertiv
SKU: AP2-80-C-100
Vertiv APM2 80KVA 480V 4W UPS 8 Minute Internal Battery Modules with Internal 4 - AP2-80-C-100
In stock · Ships same business day$93,128.00 $63,859.99 Save $29,268.01 -
Vertiv
SKU: 56BM120OSNNLS0M
Vertiv APM2 Modular Battery Cabinet - 56BM120OSNNLS0M
In stock · Ships same business day$12,250.00 $8,400.99 Save $3,849.01 -
Vertiv
SKU: APSEBCCBL3M
Vertiv APS 3 Meter EBC Cable - APSEBCCBL3M
In stock · Ships same business day$584.52 $400.99 Save $183.53 -
Vertiv
SKU: APSBATMODCU
Vertiv APS Batt MOD CSB UPS 12460 F2 FR - APSBATMODCU
In stock · Ships same business day$3,095.00 $2,122.99 Save $972.01 -
Vertiv
SKU: CPQ-1050544-02
Vertiv APS EBC Cable 1 Meter - CPQ-1050544-02
In stock · Ships same business day$533.45 $365.99 Save $167.46 -
Vertiv
SKU: AL7EBC1HHUBXLKB
Vertiv APS EBC with 1 Lithium-ion Battery String - AL7EBC1HHUBXLKB
In stock · Ships same business day$16,095.00 $11,036.99 Save $5,058.01 -
Vertiv
SKU: AS7EBC1CCUBXLKB
Vertiv APS EBC with 1 Vrla Battery String - AS7EBC1CCUBXLKB
In stock · Ships same business day$8,730.00 $5,986.99 Save $2,743.01 -
Vertiv
SKU: AL7EBC2HHUBXLKB
Vertiv APS EBC with 2 Lithium-ion Battery Strings - AL7EBC2HHUBXLKB
In stock · Ships same business day$23,220.00 $15,922.99 Save $7,297.01 -
Vertiv
SKU: AS7EBC2CCUBXLKB
Vertiv APS EBC with 2 Vrla Battery Strings - AS7EBC2CCUBXLKB
In stock · Ships same business day$10,560.00 $7,241.99 Save $3,318.01
UPS & Power Management
Uninterruptible power supplies and rack-mount power distribution for network and surveillance infrastructure. Online and line-interactive UPS models with SNMP management protect against outages and power quality issues.
Plan Your Deployment
- Calculate total VA/watt load from all connected networking and recording equipment
- Specify required battery runtime for graceful shutdown or ride-through
- Evaluate online vs. line-interactive topology for power quality needs
- Confirm rack-mount form factor and outlet count for your cabinet
UPS & Power Management — Engineering-Grade UPS & Power Management for Commercial Deployments
This category covers 4 working models of ups & power management sourced manufacturer-direct or through channel-direct US distribution. Build the rest of your system around the architectural choices below — compatibility, environmental rating, and lifecycle decisions made here propagate through every downstream component you specify.
What to Look For
UPS topology dictates power quality during normal operation and transfer behavior during failure. Standby (offline) units switch to battery on AC failure — cheapest, with brief transfer time acceptable for cameras and switches. Line-interactive units regulate voltage and absorb sags without going to battery, extending battery life. Double-conversion online UPS deliver clean, constantly-regenerated AC — required for sensitive analytical equipment and ideal for critical NVRs.
Runtime is a function of load (watts) and battery capacity (Wh). A 1000VA UPS at 500W load runs 5-8 minutes on internal batteries — enough for graceful shutdown but not extended operation. Extended battery packs add hours. Calculate actual runtime requirement based on average utility outage duration in your area and the device's recovery behavior on power restoration.
Form factor and outlet count drive rack-vs-tower choice and circuit-breaker sizing. Tower UPSs serve standalone NVRs or desktop workstations. 1U-4U rack UPSs serve data closets and rack-mounted equipment. Look at the input plug type (NEMA 5-15, L5-30, L6-30) and confirm the building circuit supports the UPS rating; over-large UPSs on under-sized circuits trip breakers during charging.
Network management cards (APC AP9640, Eaton X-Slot) provide SNMP monitoring, email alerts, and integration with VMS or facility management software. For critical sites, this is essential — silent UPS failure leaves you blind until the next outage exposes it. Schedule annual self-tests through the management interface and replace batteries every 3-5 years as a preventive measure.
Key Specs in This Category
| Spec | Available Options |
|---|---|
| IP Rating | IP20 |
| Connectivity | Wired |
| Power | AC/DC, PoE |
| Type | Power Supply |
Top Brands in This Category
Frequently Asked Questions
What size UPS do I need for an 8-camera NVR?
For an 8-camera NVR drawing about 100-150W and a small PoE switch at 200W, plan for a 1000-1500VA UPS to support 15-30 minutes of runtime. That covers most utility outages and gives ample time for graceful shutdown if power doesn't return. For sites with frequent or extended outages, scale to 2000VA+ with an extended battery pack.
How long does a UPS battery last?
Sealed lead-acid (SLA) UPS batteries typically last 3-5 years. Lithium-ion UPS batteries (newer, more expensive) last 8-10 years. Heat is the primary aging factor — UPSs in unconditioned closets fail batteries faster. Schedule replacement at year 3 for SLA and year 7 for lithium, regardless of self-test results; runtime degrades silently and slowly before complete failure.
Should I use a UPS or a generator for backup power?
UPSs cover seconds-to-minutes outages and bridge to generator startup. Generators cover hours-to-days outages but take 10-30 seconds to come online. For sites that need uninterrupted operation through extended outages, both are required: UPS bridges the generator startup gap and conditions generator power, generator covers the long tail. Standalone UPS without generator works for most commercial sites where occasional brief outages are acceptable.
Can one UPS power my entire camera system?
For small sites (8-16 cameras, single NVR, one switch) — yes, a single UPS works. For larger sites, distribute UPS protection across multiple smaller units rather than one large UPS. Reasons: failure isolation (one UPS battery failure doesn't take down everything), shorter cable runs from UPS to load (avoids voltage drop), and runtime calculation simplicity per zone.
What's the difference between line-interactive and online UPS?
Line-interactive UPSs run on utility power normally and switch to battery on failure. They include voltage regulation (AVR) that absorbs sags and surges without battery use. Online (double-conversion) UPSs continuously regenerate AC from battery-rectified DC — perfect output regardless of input quality. Online UPSs cost 2-3x more and are appropriate for highly sensitive loads (servers, lab equipment) or sites with very poor utility power.
Need help choosing? Talk to a Senior Specialist — direct line 877-277-7147 or request a quote.