Product images are provided for reference and may not represent the exact model, configuration, or included components.

No Bots, Just Experts

Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

Vertiv I10086 30A 3-Phase Metered Upgradeable Vertical Rack PDU

Overview

The Vertiv I10086 — model number MN01D4W1-33M149-3TL21A0A10-S — is a 72-inch vertical rack power distribution unit designed for high-density data center cabinets and server rooms running three-phase power. At 30A input across a 120/208V WYE configuration, it delivers up to 8.6kW of usable power with 33 total receptacles across three outlet types. What separates this unit from a basic strip is the PowerIT Upgradeable platform: the metered rPDU ships ready to monitor input phase and per-breaker current from a local LED display, and can be field-upgraded to a full monitored rPDU by installing an Interchangeable Monitoring Device (IMD) — no replacement hardware required. Manufactured in the USA, the I10086 is TAA Compliant and Buy American Act COTS Compliant, which matters for federal procurement and GSA schedules.

For teams deploying dense server and network gear in colocation or enterprise data centers, the Vertiv rack PDU line is a practical choice when you need genuine metering accuracy — not just an amber LED — alongside a clear upgrade path to remote monitoring when the budget or need arrives.

Key Features

  • 33 Mixed Receptacles Across Three Types: 24x IEC C13 outlets handle standard servers and switches; 3x IEC C19 outlets cover high-draw gear like UPS bypass feeds or high-wattage storage arrays; 6x NEMA 5-20R duplex outlets at 120V handle KVM switches, crash carts, or out-of-band management devices. One PDU handles the full rack without adapters.
  • 30A 3-Phase WYE Input at 8.6kW: The L21-30P twistlock plug feeds three independent 20A double-pole magnetic breakers — one per phase. Each breaker protects a distinct bank of outlets (8x C13 per phase, 1x C19 per phase, 2x 5-20R per phase), so a tripped breaker on Phase A doesn't drop your entire rack. This is the topology that matters during equipment moves and rebalancing exercises.
  • Three-Level Power Monitoring Without SNMP Cards: The local LED display delivers Monitoring Level 1 (aggregate unit: kWh, W, VA, Power Factor), Level 2 (per-phase A/B/C: kWh, W, VA, PF, Voltage, Current), and Level 3 (per-circuit/breaker: amperage). All voltage and current measurements comply with ANSI C12.1 and IEC 62053-21 at 1% accuracy — utility-grade precision, not estimated readings.
  • Hot-Swap IMD Upgrade Path: The Upgradeable sub-category designation means the monitoring module is field-replaceable. When network-based monitoring becomes a requirement, install the appropriate IMD — no downtime, no PDU swap, no re-cabling. Budget metering now, add remote visibility later.
  • Overload Protection Before It Becomes an Outage: Three 20A double-pole magnetic breakers provide overcurrent protection at the circuit level. Magnetic trip is faster and more consistent than thermal-only designs, especially in warm rack environments where thermal breakers can nuisance-trip at lower currents.
  • 10-Foot Power Cord, Bottom Front Entry: The 10ft / 3m cord with NEMA L21-30P twistlock exits from the bottom front, which routes cleanly to underfloor PDU whips or overhead ladder rack in typical raised-floor data centers. The entry point is not configurable post-purchase — verify your floor or whip routing before ordering.
  • 72-Inch Vertical Form Factor with Toolless Mounting: The 72in x 2in x 2in chassis occupies 2 inches of cabinet depth and mounts vertically in standard open-frame or enclosed racks. Toolless center-to-center mounting hardware supports 61.25in and 64.75in spacing — compatible with both standard 19-inch and wider deep cabinets.
  • 60°C Maximum Operating Temperature: Rated to 60°C / 140°F operating maximum, this unit handles the elevated ambient temperatures common inside densely loaded cabinets without derating. Most competitor units derate capacity above 40–45°C.
  • Regulatory Compliance Stack: UL and c-UL Listed under 62368-1 (IT and audio/video equipment safety standard), RoHS Compliant, FCC Part 15 Class A, TAA Compliant, and Buy American Act COTS Compliant. The 62368-1 listing specifically is the updated standard that replaced the older UL 60950-1 — relevant for data centers updating their equipment certification requirements.
  • 17 lbs Shipped Weight: At 17 lbs / 7.71kg, this is a manageable one-person install for standard vertical PDU mounting, assuming the rack has been secured and ballasted appropriately for the connected load.

Integration and Compatibility

The I10086 connects to any facility three-phase distribution system terminated with NEMA L21-30P receptacles. The WYE input topology (100–120V / 200–240V dual-voltage range) is compatible with North American data center PDU whips at both 120V single-phase derived and 208V three-phase configurations. The 6x NEMA 5-20R receptacles pull 120V from the WYE neutral, so they function independently of the 208V C13/C19 load banks — useful for mixed-voltage rack populations without step-down transformers.

When upgrading from metered to monitored operation, refer to Vertiv's IMD compatibility matrix for the MN01D4W1 platform to confirm the correct monitoring module. The upgrade does not require any receptacle or wiring changes. For data centers with existing rack PDU infrastructure, the I10086 integrates into the same vertical rail positions as prior-generation Vertiv Geist and Liebert rPDUs using the same toolless mounting hardware pattern.

Pair this PDU with a UPS system upstream to provide both runtime backup and clean power conditioning. For high-density deployments managing dozens of PDUs, consider pairing with a managed network switch after upgrading to a monitored IMD — SNMP-based PDU management integrates with most DCIM platforms once the IMD is installed. See our power distribution buying guide for help sizing circuits to your rack load before ordering.

Frequently Asked Questions

Q: Can the I10086 be upgraded from metered to monitored without replacing the entire unit?

A: Yes. The I10086 is part of Vertiv's PowerIT Upgradeable platform. An Interchangeable Monitoring Device (IMD) can be installed in the field to add network-based monitoring capabilities. No PDU replacement or re-cabling is required.

Q: What is the warranty on the Vertiv I10086?

A: The I10086 carries a 5-year limited warranty from Vertiv.

Q: Is the I10086 TAA compliant?

A: Yes. The I10086 is manufactured in the USA and is both TAA Compliant and Buy American Act COTS Compliant, making it eligible for federal and government procurement programs.

Q: What plug type does the I10086 require, and what power infrastructure does it need?

A: The I10086 uses a NEMA L21-30P twistlock plug. It requires a three-phase WYE circuit rated at 30A, typically delivered via a data center PDU whip at 120/208V. Verify that your facility's distribution panels include L21-30R receptacles before ordering.

Q: How accurate is the power metering on the I10086?

A: Voltage and power measurements comply with ANSI C12.1 and IEC 62053-21 at 1% accuracy. Per-circuit/breaker current measurements are independently tested and verified at 2% accuracy.

Q: What are the physical dimensions and mounting requirements for the I10086?

A: The chassis measures 72in x 2in x 2in (1829mm) and mounts vertically. Toolless mounting hardware supports center-to-center spacing of 61.25in and 64.75in, compatible with standard rack form factors. Shipped weight is 17 lbs (7.71kg).

Ted Perry
Ted Perry

The I10086 sits in a useful middle ground that gets overlooked: you get utility-grade 1% accuracy metering and per-phase visibility today, and you can add network-based monitoring via IMD hot-swap without any downtime or hardware swap when the operational requirement materializes. For teams deploying racks in phases or under capital constraints, that upgrade path is worth more than it sounds — you're not locked into a bare strip or forced to budget full SNMP-enabled PDUs on day one.

Technical Highlights:

  • Three-Level Local Metering: Level 1 covers aggregate unit kWh/W/VA/PF; Level 2 breaks out per-phase (A/B/C) voltage and current; Level 3 reports per-breaker amperage — all on the local scrolling LED display without a network connection or management card.
  • Per-Phase Breaker Isolation: Three independent 20A double-pole magnetic breakers map one per phase. A fault or overload on Phase B trips only that breaker — the C13 banks on Phases A and C stay live. This is the architecture that prevents a single equipment failure from taking down a full 33-outlet rack.
  • 60°C Operating Rating: Most PDUs derate above 40–45°C; this unit is spec'd to 60°C / 140°F, which matters in high-density cabinets where internal ambient routinely climbs 15–20°C above room temperature during peak load.

Deployment Considerations:

  • Power entry is bottom front only — confirm your PDU whip or underfloor routing reaches that point before racking. Overhead-only cable paths may require a flexible conduit extension or whip repositioning.
  • The 6x NEMA 5-20R receptacles operate at 120V from the WYE neutral. If you're running a pure 208V rack (all IEC gear), those six outlets will go unused — factor that into outlet utilization planning. Conversely, if you need more 120V capacity, this is one of the few vertical PDUs in this class that provides it natively.

The I10086 is particularly well-matched to colocation deployments where tenants are metered on per-cabinet consumption — the ANSI C12.1 / IEC 62053-21 compliant measurement gives you defensible billing-grade data at the rack level, which eliminates disputes with facilities teams over actual vs. estimated draw.

Specifications
Model Number: MN01D4W1-33M149-3TL21A0A10-S
Category: Metered
Sub Category: Upgradeable
Power Configuration: 30A, 120/208V WYE, 8.6kW
Physical Configuration: 72in / 1829mm, Vertical
Plug Form: L21-30P
Receptacle IEC C13 Quantity: 24
Receptacle IEC C19 Quantity: 3
Receptacle NEMA 5-20R Quantity: 6
Input Voltage: 100-120/200-240V WYE
Current: 30A x 3 Phase WYE
VA per Input: 8.6kW (208V)
Frequency: 50/60Hz
Over Current Protection: 3 x 20A Double Pole Magnetic Breakers
Power Cable Length: 10ft / 3m
Power Entry Location: Bottom Front
Plug Type: NEMA L21-30P Twistlock
Total Receptacle Quantity: 33
Maximum Operating Temperature: 60C / 140F
Chassis Dimensions: 72in x 2in x 2in
Shipped Weight: 17lbs (7.71kg)
Warranty: 5-year limited
Agency Approvals: UL & c-UL Listed 62368-1, RoHS Compliant, FCC Part 15 Class A
Q&A
Reviews
Have Questions?

Vertiv MN01D4W1-33M149-3TL21A0A10-S - I10086

$1,310.00
$898.99

RELATED PRODUCTS

System Design, Deployment & Technical Support

Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

Fixed scope • Fixed price

System Design Assistance

  • Get help validating product compatibility
  • Coverage requirements
  • Storage planning and deployment architecture before you buy.
Request Design Help

Deployment & Configuration Support

  • Access fixed-scope support for rollout planning
  • User setup guidance
  • Migration and system standardization across single-site or multi-site deployments
View Support Services

Guides, Tools & Calculators

  • PoE requirements
  • Storage retention
  • Camera selection and deployment methodology
Open Technical Resources