Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

APC by Schneider Electric GVSUPS50KR0B5GS Galaxy VS 50kW 480V N+1 Three-Phase UPS

Overview

The APC Galaxy VS GVSUPS50KR0B5GS is a 50kW, 480V three-phase uninterruptible power supply designed for mid-to-large commercial and industrial installations where losing power is not an option. This configuration ships with an N+1 redundant power module and five smart modular 9Ah battery strings — a combination that lets you take a power module offline for service without dropping a single watt of load. If your facility runs server rooms, network operations centers, or critical manufacturing control systems at 480V, the Galaxy VS is the tier of protection worth specifying. Pair this unit with compatible power protection infrastructure to build a fully redundant power stack.

APC by Schneider Electric's Galaxy VS line occupies the space between basic rack-mounted UPS units and full-scale data center frames. The GVSUPS50KR0B5GS lands at 50kW — enough headroom for dense compute clusters, medical imaging equipment, or multi-rack network environments where a single UPS needs to anchor an entire power zone. Browse the full APC by Schneider Electric catalog to compare Galaxy VS configurations by power rating and battery capacity.

Key Features

  • 50kW Nominal Output at 480V: Three-phase 480V input and output means this unit integrates directly with commercial electrical infrastructure without a step-down transformer — simplifying installation and reducing points of failure in the power path. At 50kW, you have enough capacity to protect 40–50 kW of IT or process load while maintaining safe operating headroom.
  • N+1 Redundant Power Module: The factory-included N+1 power module means the system can sustain full rated output even if one power module fails or is pulled for maintenance. For environments governed by Tier II or Tier III uptime standards, N+1 at the UPS level is often a compliance requirement, not just a preference.
  • 5 Smart Modular 9Ah Battery Strings: Five independently managed 9Ah battery strings give you granular battery health visibility and the ability to replace a single failed string without taking the UPS offline. Modular battery architecture directly reduces the maintenance windows your facilities team needs to schedule — critical in 24/7 operations like security operations centers and hospital data closets.
  • Modular Scalability: The Galaxy VS platform is built around a modular chassis concept. As load grows, you can add power modules rather than replacing the entire UPS frame — protecting your capital investment and avoiding the forklift upgrades that come with fixed-capacity units.
  • Start-Up 5×8 Service Included: The GVSUPS50KR0B5GS ships with Start-up 5×8 service, meaning APC-certified commissioning during business hours is bundled. For a 50kW three-phase system at 480V, proper commissioning is not optional — incorrect startup procedures on three-phase UPS hardware can void manufacturer warranty and introduce safety risks. Having a defined startup service removes that liability from your installation team.
  • Designed for Parallel UPS Architecture: The Galaxy VS supports parallel operation, which means you can deploy two units in an active-active parallel configuration for true 2N redundancy — the right architecture for Tier III data centers or any facility where a single UPS failure cannot be tolerated even momentarily.

Integration and Compatibility

The GVSUPS50KR0B5GS is designed to integrate with APC's EcoStruxure IT monitoring ecosystem, enabling real-time power monitoring, predictive battery alerts, and remote management via network management cards. In network infrastructure deployments, this integration gives facilities teams visibility into UPS health from the same dashboard used for switches, PDUs, and environmental sensors — reducing the number of separate monitoring tools required. For organizations running three-phase UPS systems in parallel, the Galaxy VS platform supports synchronized parallel modules from the same family, letting you scale from 50kW to higher aggregate capacity without changing out distribution switchgear.

Before specifying the GVSUPS50KR0B5GS, confirm that your facility's electrical panel supports 480V three-phase input at the amperage required for 50kW continuous load. Upstream overcurrent protection sizing and conduit runs should be engineered by a qualified electrical contractor — this is not a self-install unit.

Frequently Asked Questions

Q: What is the nominal power output of the GVSUPS50KR0B5GS?

A: The GVSUPS50KR0B5GS delivers 50kW of nominal output power at 480V, three-phase. This is sufficient for mid-density data halls, medical imaging suites, or industrial control environments operating on 480V commercial electrical infrastructure.

Q: What does N+1 mean in the context of this UPS configuration?

A: N+1 means the system includes one more power module than the minimum required to support the rated 50kW load. If one module fails or must be removed for maintenance, the remaining modules sustain full output without any interruption to connected equipment.

Q: How many battery strings does the GVSUPS50KR0B5GS include, and can they be replaced individually?

A: This configuration ships with five smart modular 9Ah battery strings. Because they are independently managed and modular, a single degraded string can be swapped out without shutting down the UPS or interrupting the protected load — a significant advantage over monolithic battery designs.

Q: What is the input voltage requirement for the GVSUPS50KR0B5GS?

A: The unit requires 480V three-phase input. Confirm your facility's electrical supply matches this spec before purchase. Standard US commercial buildings may require a transformer if they operate at 208V or 240V distribution.

Q: Does the GVSUPS50KR0B5GS include commissioning or startup service?

A: Yes. The GVSUPS50KR0B5GS includes Start-up 5×8 service, providing factory-supported commissioning during standard business hours. For a 50kW three-phase system, professional startup is strongly recommended and in some cases required to maintain manufacturer warranty coverage.

Q: Can the GVSUPS50KR0B5GS be deployed in a parallel UPS configuration?

A: The Galaxy VS platform supports parallel operation, allowing two or more units to run in active-active mode for 2N redundancy. This is the correct architecture for Tier III facilities or any environment where a single UPS failure cannot result in load loss under any circumstances.

Jerry Tildsen
Jerry Tildsen

The spec I always anchor on with the GVSUPS50KR0B5GS is the five-string modular battery architecture. At 50kW, battery maintenance is a recurring cost and operational headache — the modular design means your team replaces individual 9Ah strings rather than scheduling a full battery plant changeout, which on a monolithic system at this power tier easily runs to a multi-hour maintenance window with load transferred to bypass.

Technical Highlights:

  • 50kW at 480V Three-Phase: Integrates directly into 480V commercial distribution without an intermediate transformer — fewer components, fewer failure points, and lower installation cost compared to step-down configurations.
  • N+1 Power Module: Factory-included redundancy means any single power module can fail or be pulled for hot-swap service without shedding load — this is the feature that lets you avoid scheduling downtime for power module maintenance.
  • 5 × 9Ah Smart Battery Strings: Independent monitoring per string gives you actionable battery health data at the string level, not just aggregate voltage — you'll know which string is degrading before it takes down runtime capacity for the other four.

Deployment Considerations:

  • The 480V three-phase input is non-negotiable — verify your facility's electrical supply before purchase. If your distribution is 208V or 240V, you'll need a step-up transformer upstream, which changes the cost and complexity of the installation significantly.
  • The bundled Start-up 5×8 service is business-hours only. If your commissioning window needs to happen on a weekend or outside 8×5 coverage, budget for an upgraded service agreement — do not skip professional startup on a 50kW three-phase system.

The GVSUPS50KR0B5GS is the right specification for a mid-sized colocation cage, a hospital MRI or radiology suite, or an industrial control room where 480V distribution is already in place and the maintenance team needs to service battery strings without scheduling load transfers. The N+1 architecture makes it defensible in Tier II compliance conversations without the cost of a full Tier III frame.

Specifications
Product Code: GVSUPS50KR0B5GS
Nominal Power: 50 kW
Input Voltage: 480V
Battery Strings: 5 x 9Ah
freight: 644.76
Q&A
Reviews
Have Questions?

APC by Schneider Electric GVSUPS50KR0B5GS 50KW UPS

$60,380.00
$40,208.99

RELATED PRODUCTS

System Design, Deployment & Technical Support

Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

Fixed scope • Fixed price

System Design Assistance

  • Get help validating product compatibility
  • Coverage requirements
  • Storage planning and deployment architecture before you buy.
Request Design Help

Deployment & Configuration Support

  • Access fixed-scope support for rollout planning
  • User setup guidance
  • Migration and system standardization across single-site or multi-site deployments
View Support Services

Guides, Tools & Calculators

  • PoE requirements
  • Storage retention
  • Camera selection and deployment methodology
Open Technical Resources