Product images are provided for reference and may not represent the exact model, configuration, or included components.

Overview

SKU: GVMSBCLB675KG
Condition: New
Write a Review 32% OFF

APC by Schneider Electric Galaxy VM System Bypass Cabinet 675K 480V with Load Bank - GVMSBCLB675KG

APC by Schneider Electric GVMSBCLB675KG Galaxy VM System Bypass CabinetOverviewThe APC by Schneider Electric GVMSBCLB675KG is a Galaxy VM Series syste…

$42,295.00 $28,800.99 SAVE $13494
Ships same business day
In stock

Quantity:

Adding to cart… The item has been added
Compatibility guidance available for your deployment
Senior specialists for pre and post-sales support
Authorized sourcing and documentation support
Shipping and lead-time confirmation before install

Laura Bennett, IPSD Senior Specialist

Talk to Laura

200+ hrs training • U.S - based

Senior Specialist • 877-277-7147

APC by Schneider Electric Galaxy VM System Bypass Cabinet 675K 480V with Load Bank - GVMSBCLB675KG

$42,295.00
$28,800.99

Overview

SKU: GVMSBCLB675KG
Condition: New

No Bots, Just Experts

Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

APC by Schneider Electric GVMSBCLB675KG Galaxy VM System Bypass Cabinet

Overview

The APC by Schneider Electric GVMSBCLB675KG is a Galaxy VM Series system bypass cabinet rated at 675 kVA for 480V three-phase installations, paired with an integrated load bank. Bypass cabinets at this scale serve a single critical function: they let data center and industrial power teams take the primary UPS offline for maintenance, testing, or replacement without dropping critical loads. The load bank integration adds on-site commissioning and periodic UPS testing capability — eliminating the need to bring in external test equipment for scheduled load acceptance tests.

The Galaxy VM platform is APC by Schneider Electric's enterprise UPS line targeting large data centers, industrial facilities, and critical infrastructure environments where a 675 kVA bypass is warranted. If you are sourcing this cabinet, it is almost certainly paired with a Galaxy VM UPS module of matching capacity.

Key Features

  • 675 kVA Bypass Capacity at 480V: Matched to Galaxy VM UPS installations at this voltage and capacity tier. Mismatching bypass cabinet ratings to UPS capacity is a common commissioning error — confirm your UPS module nameplate before ordering.
  • Integrated Load Bank: Allows periodic full-load testing of the upstream UPS without requiring portable load bank rental. For facilities with annual commissioning requirements or service contracts, this reduces scheduled maintenance complexity and cost.
  • System-Level Integration: Designed as a matched component within the Galaxy VM power distribution architecture, not a generic third-party bypass. Electrical coordination, mechanical fit, and control bus integration are factory-matched to the Galaxy VM platform.
  • Commercial-Grade Construction: Built for permanent installation in critical power environments — not intended for temporary or light-duty use cases.

Integration and Compatibility

The GVMSBCLB675KG is designed for use within Galaxy VM UPS deployments. Integrators specifying this cabinet should verify compatibility with the specific Galaxy VM UPS module SKU, local electrical code requirements for 480V three-phase bypass configurations, and facility switchgear ratings. Consult the Galaxy VM system design documentation and engage a licensed electrical contractor for final installation — large-format bypass cabinets at this capacity class require licensed electrical work in virtually all jurisdictions.

For procurement teams sourcing uninterruptible power supplies and associated infrastructure, confirm the full Galaxy VM BOM (UPS module, bypass cabinet, distribution, and monitoring) is coordinated prior to purchase. Lead times on large-format power infrastructure can affect project scheduling significantly.

Frequently Asked Questions

Q: What UPS platform is the GVMSBCLB675KG designed to work with?

A: The GVMSBCLB675KG is part of the APC Galaxy VM series and is designed for use with Galaxy VM UPS systems at 675 kVA, 480V. It is not a universal bypass cabinet — confirm your UPS module SKU with APC documentation before specifying this cabinet.

Q: Does the GVMSBCLB675KG include a load bank, and what is it used for?

A: Yes, the product name indicates an integrated load bank (LB designation). Load banks allow you to test the UPS under controlled load conditions without requiring actual IT load, which is useful during commissioning and periodic service testing.

Q: What voltage and capacity is this bypass cabinet rated for?

A: The GVMSBCLB675KG is rated for 675 kVA at 480V, three-phase. This is a large-format power infrastructure component intended for enterprise data centers and industrial facilities — not suitable for small or mid-size deployments.

Q: Is professional installation required?

A: Yes. A 675 kVA, 480V system bypass cabinet requires installation by a licensed electrical contractor. This is not a plug-and-play device. Engage qualified power engineers and comply with local electrical code (NEC and applicable local amendments) for three-phase high-capacity bypass installations.

James Everett
James Everett

The GVMSBCLB675KG is a purpose-built system bypass cabinet for 675 kVA Galaxy VM UPS installations running on 480V three-phase power. The integrated load bank is what separates this from a standard bypass cabinet — it removes the scheduling friction of bringing in external load test equipment for annual or contractual commissioning runs, which matters when you are maintaining an SLA on uptime at a colocation or enterprise data center site.

Technical Highlights:

  • 675 kVA Rating: Matched to the Galaxy VM UPS capacity tier — bypass cabinets must be rated at or above the connected UPS to safely carry full load during maintenance windows. Undersized bypass is a serious fault risk.
  • 480V Three-Phase Architecture: Standard for North American large-scale data center and industrial power distribution. Confirms this cabinet is not suitable for 208V or international 400V installations without re-verification.
  • Integrated Load Bank: Eliminates the need for portable rental load banks during scheduled UPS testing — a direct reduction in service event cost and logistics, particularly relevant for sites with annual acceptance test requirements.

Deployment Considerations:

  • This cabinet is a matched Galaxy VM system component, not a standalone bypass unit. Specify it only when the upstream UPS module is confirmed as a Galaxy VM at 675 kVA — mixing product families or capacity tiers at this voltage level creates coordination problems that are expensive to resolve post-installation.
  • Lead times for large-format power infrastructure in this class can be significant. Confirm availability and delivery schedule well ahead of the project critical path — late delivery of a bypass cabinet can delay the entire UPS commissioning sequence.

The GVMSBCLB675KG is the right specification for enterprise data centers and large industrial facilities already committed to the Galaxy VM platform at 675 kVA, where built-in load test capability is a maintenance program requirement rather than a nice-to-have.

Specifications
Mfr: GVMSBCLB675KG
Unspsc: 43211600
Item: 002596166
Cnet Cat Code: 100616
Q&A
Reviews
Have Questions?

RELATED PRODUCTS

System Design, Deployment & Technical Support

Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

Fixed scope • Fixed price

System Design Assistance

  • Get help validating product compatibility
  • Coverage requirements
  • Storage planning and deployment architecture before you buy.
Request Design Help

Deployment & Configuration Support

  • Access fixed-scope support for rollout planning
  • User setup guidance
  • Migration and system standardization across single-site or multi-site deployments
View Support Services

Guides, Tools & Calculators

  • PoE requirements
  • Storage retention
  • Camera selection and deployment methodology
Open Technical Resources