APC by Schneider Electric
SKU: APDU10452MO
Overview
Manufacturer-verified compatible cameras, recorders, mounts, accessories, and licenses for this product. Adjust quantities and add the entire bundle to your cart in one click.
Overview
Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.
The APC by Schneider Electric APDU11452ME is a 3-phase advanced metered rack PDU delivering 17.3kW at 208V/60A — engineered for high-density data center cabinets where per-outlet visibility and load balancing across phases are non-negotiable. If you're managing racks packed with blade servers, storage arrays, or high-draw network gear and need real-time current draw per phase without deploying a separate monitoring overlay, this is the unit to evaluate. The IEC 60309 60A 3P+PE input plug connects directly to your facility's three-phase distribution without adapters, and a 10-foot (3m) cord gives enough slack for most overhead or underfloor routing scenarios.
Browse the full APC by Schneider Electric catalog for compatible accessories and complementary infrastructure products.
The APDU11452ME integrates with APC's Network Management Card (NMC) platform via its onboard gigabit Ethernet port, enabling SNMP, Modbus, and RESTful API access for data center infrastructure management tools. The network port sharing architecture — two link ports supporting up to 32 PDUs per NMC — is purpose-built for row-level deployments where minimizing IP address consumption and management overhead matters. Compatible DCIM platforms that support SNMP or APC's NMC protocol can ingest per-phase and per-outlet data directly.
For deployments pairing this PDU with rack enclosures, confirm that your cabinet's power entry point and whip configuration match the IEC 60309 60A 3P+PE input. APC Netshelter racks are a natural pairing. If you're planning a new row build, also review rack power distribution options to match PDU capacity against your facility's panel circuit ratings.
For a deeper look at sizing PDUs to your actual load requirements, see the data center power planning guide before committing to a 60A 3-phase circuit.
Q: What input plug does the APDU11452ME use, and does it require a special circuit?
A: The APDU11452ME uses an IEC 60309 60A 3P+PE input plug on a 3-phase 208V circuit. This is an industrial locking connector — not a standard NEMA plug. Your facility must have a dedicated 3-phase 60A PDU receptacle or whip termination to support this unit.
Q: How many PDUs can share a single network port with this unit?
A: Up to 32 PDUs can share a single IP address using the Network Port Sharing feature via the two link ports. This allows large row deployments to consolidate management under far fewer IP addresses, reducing SNMP polling overhead and firewall complexity.
Q: What is the metering accuracy of the APDU11452ME?
A: Metering accuracy is ±1%, which is sufficient for billing-quality capacity planning and load threshold alerting in DCIM platforms without requiring correction factors.
Q: What outlet types does the APDU11452ME provide?
A: The unit provides 42 total outlets in a mixed configuration spanning C13, C15, C19, and C21 receptacles across two banks of 21 outlets each — covering both standard 1U server power cords and high-draw storage or networking gear with C20 plugs.
Q: What is the maximum operating temperature for the APDU11452ME?
A: The unit is rated for operating temperatures up to 60°C (140°F), providing headroom for warm-aisle deployments and edge locations where ambient rack temperatures may be elevated.
Q: Does the APDU11452ME include a network management card, or is it an add-on?
A: The APDU11452ME has an onboard 10/100/1000 Ethernet port integrated into the unit — no separate NMC card purchase is required for network connectivity and metering access.

The APDU11452ME sits in the right slot for data center row deployments where 3-phase load balancing and accurate per-phase metering are requirements, not nice-to-haves. The ±1% metering accuracy is the spec I'd anchor on here — most metered PDUs in this class run ±2%, and that gap matters when you're using PDU readings as the primary input to capacity planning models rather than just a rough sanity check.
Technical Highlights:
Deployment Considerations:
This unit is well-suited for new high-density row builds in co-location or enterprise data centers where the facility has 3-phase 208V distribution infrastructure already in place and the operations team needs metering data accurate enough to feed DCIM capacity thresholds directly, without manual calibration offsets.
Manufacturer-verified compatible cameras, recorders, mounts, accessories, and licenses for this product. Adjust quantities and add the entire bundle to your cart in one click.
Looking for more APC by Schneider Electric products? Shop the full APC by Schneider Electric catalog →
Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.
Fixed scope • Fixed price