Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

APC by Schneider Electric SY32K96H Symmetra PX 32kW Scalable to 96kW 400V 3-Phase Online UPS

Overview

The APC by Schneider Electric SY32K96H is a large-frame, three-phase double-conversion online UPS designed for data centers, critical infrastructure, and industrial facilities running on 400V European/international power architectures. Rated at 32kW out of the box but field-expandable to 96kW without replacing the cabinet, it solves the budget-versus-futureproofing tension that plagues large power infrastructure purchases — you pay for 32kW today and add capacity as loads grow. At 1,095 kg and nearly two meters tall, this is a floor-standing, fixed-installation unit intended for server rooms and purpose-built equipment rooms, not a roll-in appliance.

The unit ships with a preinstalled network management card with CAN, meaning remote monitoring and integration into a building management system is available on day one, without an additional card purchase.

Key Features

  • Double-Conversion Online Architecture: The SY32K96H runs in true double-conversion mode continuously — incoming AC is rectified to DC, then inverted back to clean AC for the load. The result is output voltage held to ±1% static and ±5% at full 100% load step, with output harmonic distortion under 2%. Generators, shared transformers, and noisy industrial feeds that would degrade a line-interactive UPS are fully isolated from protected equipment.
  • 32kW to 96kW Field Scalability: The frame ships with 2 power modules installed and 8 free slots. Adding modules in the field — without a new cabinet, without a new feed, without a planned outage for cabinet swap — means a phased data center buildout can track actual load growth rather than overbuying on day one. Maximum configurable power is 96,000 W / 96,000 VA.
  • 95% Operating Efficiency: At a facility running this UPS 8,760 hours per year, the 5% losses at full rated load translate to roughly 1,600 kWh of heat per year at 32kW. Heat dissipation is rated at 5,146 Btu/h — factor that into your CRAC/CRAH cooling budget. Higher efficiency modes available on larger UPS families can squeeze this further, but 95% is solid for a fully online topology at this power class.
  • Built-In Static Bypass (160A rated): The static bypass is internal, rated for 160A with max bypass input current of 139A. Bypass transfers are instantaneous (no break), so maintenance or overload events don't mean a momentary power interruption to connected loads. Overcurrent protection on bypass is 160A; switching current capacity reaches 200A for fault handling.
  • VRLA Battery System with 3.5-Hour Recharge: Three battery slots are filled at shipment, with six free slots for runtime extension. Battery voltage is ±192V (discharge threshold ±154V). The 3.5-hour recharge time means that after a full discharge event, the system is back to protected status within a half shift — relevant for facilities that see multiple power events per day. Battery design life is rated at 5–8 years depending on operating conditions.
  • Wide Input Voltage Range (340–477V) and Frequency Tolerance (40–70 Hz): The rectifier accepts input from 340V to 477V, covering 380V, 400V, and 415V three-phase supplies without taps or transformer changes. The 40–70 Hz frequency window means the unit works equally on 50 Hz European grids and 60 Hz installations, and handles generator frequency drift without switching to battery unnecessarily.
  • Input Harmonic Distortion Under 5%: Less than 5% THDI at the input keeps the UPS from injecting harmonic current back into shared building distribution — a real concern on transformer-limited switchboards where multiple large loads share a common feed. Generator sets with undersized alternators are particularly sensitive to harmonic loading; this spec means the SY32K96H is a cooperative load.
  • Overload Ride-Through (125% for 10 minutes, 150% for 60 seconds): Brief overloads during server spin-up, storage array initialization, or HVAC compressor starts won't trip the UPS immediately. Ten minutes at 125% load gives operators time to shed load deliberately rather than being forced into bypass by a transient condition.
  • 0–40°C Operating Range, NEMA 1 / IP20 Enclosure: Suitable for controlled equipment rooms and data center floors. Not rated for outdoor or wet locations — this is an indoor unit. Operating altitude tops out at 3,333 ft (approximately 1,016 m); derate or consult manufacturer guidance for higher-altitude sites.
  • 61 dBA Acoustic Level: Audible in a quiet room but within normal data center floor ambient. Not appropriate for open office environments adjacent to occupied workspaces without an acoustic enclosure.

Integration and Compatibility

The SY32K96H ships with a network management card with CAN preinstalled, enabling SNMP-based monitoring, event logging, and integration with APC by Schneider Electric's EcoStruxure IT management platform out of the box. The hardwired 5-wire input (3P + N + E) and output connectors mean termination is a licensed electrical contractor job — plan for that in your installation schedule. Input protection uses GL fuses; bypass wiring is a 5-wire configuration matching the input.

Standards compliance includes EN 50091-1, EN/IEC 62040-1-1, EN/IEC 62040-2, EN/IEC 62040-3 (VFI-SS-111 classification, meaning Voltage and Frequency Independent — the most protective UPS classification), ISO 9001, and ISO 14001. EUROBAT certification covers the battery system. This is a three-phase UPS built to European electrical standards; confirm your local code authority accepts IEC 62040-series compliance before specifying.

Two free card slots allow expansion of monitoring, relay interfaces, or extended communication options beyond the factory-installed network management card. The preinstalled card includes CAN bus capability for integration with modular system components.

Frequently Asked Questions

Q: Can the SY32K96H be expanded beyond 32kW after initial installation?

A: Yes. The unit ships with 2 power modules installed and 8 free module slots, allowing field expansion up to a maximum of 96,000W (96kW) without replacing the cabinet or the distribution infrastructure. Capacity is added by populating the available slots with compatible power modules.

Q: What input voltage and frequency does the SY32K96H accept?

A: The rectifier accepts 340–477V three-phase input, covering 380V, 400V, and 415V supplies. Input frequency range is 40–70 Hz, accommodating both 50 Hz and 60 Hz grids and generator sources with frequency deviation.

Q: What type of bypass does the SY32K96H use?

A: It uses an internal static bypass rated at 160A (bypass current protection), with a max bypass input current of 139A. The bypass transfer is instantaneous — no momentary interruption to connected loads during a bypass event.

Q: What is the operating temperature range, and can this unit be installed outdoors?

A: Operating ambient is 0–40°C. The enclosure is rated NEMA 1 / IP20 — this is an indoor unit only. It is not suitable for outdoor, wet, or harsh industrial environments without additional enclosure protection.

Q: How long does the battery take to recharge after a full discharge?

A: Battery recharge time is rated at 3.5 hours. The battery charger delivers up to 2,954W. Three battery slots are factory-filled; six additional slots are available for runtime extension modules.

Q: What certifications and standards does the SY32K96H meet?

A: Certified to EN 50091-1, EN/IEC 62040-1-1, EN/IEC 62040-2, EN/IEC 62040-3 (VFI-SS-111 classification), ISO 9001, ISO 14001, and EUROBAT. The VFI-SS-111 designation confirms this is a true double-conversion, voltage-and-frequency-independent design per IEC classification.

Ted Perry
Ted Perry

The SY32K96H is one of the few large three-phase UPS platforms at this power class where the scalability argument is actually credible at the spec level — 8 open module slots in a 400V frame means you can start at 32kW and reach 96kW without touching the cabinet, the feeders, or the bypass infrastructure. If you're sizing for a phased data center buildout or a facility where IT load projections are genuinely uncertain, that matters more than buying a 96kW unit at full cost on day one.

Technical Highlights:

  • VFI-SS-111 Classification (IEC 62040-3): This is the highest UPS performance tier under the IEC standard — Voltage and Frequency Independent, meaning the inverter is always in the power path. Output voltage stays within ±1% static and ±5% at full load step regardless of what the input is doing. For loads that are sensitive to frequency or voltage deviation (precision lab instruments, high-density server clusters), this classification is non-negotiable.
  • Input THDI Under 5%: On a shared switchboard or a generator-backed distribution panel, a UPS that injects harmonic current back upstream degrades power quality for every other load on that bus. Less than 5% THDI means the SY32K96H is a well-behaved load — relevant when the unit shares a transformer with building HVAC or other large motor loads.
  • 3.5-Hour Battery Recharge at 2,954W Charger Capacity: Most competing platforms at this class target 4–6 hour recharge. The 3.5-hour figure, driven by the 2,954W charger, is operationally meaningful in facilities that see multiple grid events per day — utility brownouts, generator exercise cycles, switching transients. A faster recharge window reduces the exposure period between events.

Deployment Considerations:

  • At 1,095 kg fully configured, floor loading is a real engineering item — verify your raised-floor or slab rating before positioning. The unit is 120 cm wide × 107 cm deep × 199.1 cm tall; route your conduit and cable trays before the unit is moved into position, not after. Hardwired 5-wire terminations on both input and output mean a licensed electrician is in the critical path for commissioning.
  • Operating altitude is capped at 3,333 ft (approximately 1,016 m) without derating. Sites above that elevation — mountain-region data centers, high-altitude industrial facilities — need to confirm derating figures with APC before specifying this unit. The 0–40°C operating window is also firm; facilities running ambient above 35°C consistently should factor in battery life reduction beyond the published 5–8 year design life.

The SY32K96H is the right specification for a greenfield European-standard data center or critical infrastructure room where the initial load is well under the 96kW ceiling but load growth is expected within a 3–5 year horizon — the modularity absorbs that growth without a forklift upgrade.

Specifications
Height: 199.1 cm
Width: 120 cm
Depth: 107 cm
Net Weight: 1095.4 kg
Battery Charger Power: 2954 W
Battery Design Life: 5…8 year(s)
Bypass Wiring Configuration: 5 wire (3P + N + E)
Max Bypass Input Current: 139 A
Bypass Current Protection: 160 A
Number Of Power Module Free: 8 Slots
Number Of Power Module Filled: 2 Slots
Network Frequency: 40...70 Hz
Number Of Input Connectors: 1 hard wire 5-wire (3P + N + E)
Input Voltage Limits: 340...477 V
Maximum Input Current: 59 A
Switching Current Capacity: 200 A
Max Short Time Withstand: 30 kA
Input Harmonic Distortion: Less than 5 %
Input Protection Type: GL fuse
Load Power Factor: 0.5 leading to 0.5 lagging
Maximum Configurable Power: 96000 W
Output Harmonic Distortion: Less than 2 %
Output Frequency: 50/60 Hz +/- 3 Hz
Ups Type: Double conversion online
Wave Type: Sine wave
Output Voltage Tolerance: +/- 1% static and +/- 5% at 100% load step
Output Overload Operation: 10 minutes at 125% and 60 seconds at 150%
Required Output Current: 160 A
Neutral Output Current: 80 A
Bypass Type: Built-in static bypass
Efficiency: 95 %
Maximum Configurable Power In VA: 96000 VA
Product Certifications: EUROBAT
Standards: EN 50091-1 EN/IEC 62040-1-1 EN/IEC 62040-2 EN/IEC 62040-3 ISO 14001 ISO 9001 VFI-SS-111
Ambient Air Temperature For Operation: 0…40 °C
Relative Humidity: 0…95 %
Operating Altitude: 0...3333 ft
Ambient Air Temperature For Storage: -15…40 °C
Storage Altitude: 0.00…15240.00 m
Acoustic Level: 61 dBA
Heat Dissipation: 5146 Btu/h
Nema Degree Of Protection: NEMA 1
Ip Degree Of Protection: IP20
Free Slots: 2
Preinstalled Device: Network management card with CAN
Main Input Voltage: 400 V 3 phases
Other Input Voltage: 380 V 400 V 415 V
Main Output Voltage: 230 V 400 V 3 phases
Other Output Voltage: 380 V 400 V 415 V
Rated Power In W: 32000 W
Rated Power In VA: 32000 VA
Output Connector Type: Hard wire 5-wire (3P + N + E)
Battery Type: VRLA
Number Of Battery Filled Slots: 3
Number Of Battery Free Slots: 6
Battery Recharge Time: 3.5 h
Battery Voltage: +/- 192 V
Discharge Battery Voltage: +/- 154 V
Overcurrent Protection: 756 A
Maximum Short-Circuit Current: 2 kA
Max Current Discharge: 110 A
Q&A
Reviews

APC by Schneider Electric SY32K96H 32kW

$102,320.00
$70,256.99

RELATED PRODUCTS

Save $686.01
APC by Schneider Electric Schneider Electric APC - SRT192BP
Add to Cart The item has been added

APC by Schneider Electric SRT192BP

APC by Schneider Electric Schneider Electric APC - SRT192BP

192V lead acid rackmount battery pack designed to extend the runtime of compatible Smart-UPS SRT series uninterruptible power supplies

    In stock · Ships same business day Free shipping over $499
    $2,560.00 $1,873.99 Save $686.01
    The item has been added Add to quote
    $2,560.00 $1,873.99 Save $686.01
    Save $686.01 Add to cart Add to quote
    Save $141.01
    APC by Schneider Electric Schneider Electric AP9551 - Power
    Add to Cart The item has been added

    APC by Schneider Electric AP9551

    APC by Schneider Electric Schneider Electric AP9551 - Power

    14-outlet, 120V rack mount PDU from APC by Schneider Electric, designed to distribute power from a single NEMA L5-20P source across up to 14 devices

      Usually Ships in 2-3 Weeks Free shipping over $499
      $426.00 $284.99 Save $141.01
      The item has been added Add to quote
      $426.00 $284.99 Save $141.01
      Save $141.01 Add to cart Add to quote

      System Design, Deployment & Technical Support

      Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

      Fixed scope • Fixed price

      System Design Assistance

      • Get help validating product compatibility
      • Coverage requirements
      • Storage planning and deployment architecture before you buy.
      Request Design Help

      Deployment & Configuration Support

      • Access fixed-scope support for rollout planning
      • User setup guidance
      • Migration and system standardization across single-site or multi-site deployments
      View Support Services

      Guides, Tools & Calculators

      • PoE requirements
      • Storage retention
      • Camera selection and deployment methodology
      Open Technical Resources