Build Your Complete System
Manufacturer-verified compatible cameras, recorders, mounts, accessories, and licenses for this product. Adjust quantities and add the entire bundle to your cart in one click.
No Bots, Just Experts
Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.
Server Technology C2WG36TE-DCMFAM66 Switched 36-Outlet 3-Phase PDU
The Server Technology C2WG36TE-DCMFAM66 is a switched POPS MASTER PRO2 rack power distribution unit built for 3-phase data center racks that need per-outlet control without guessing at load balancing. Rated for 208V 3-phase delta input at 8.6kW capacity, this unit gives 36 HDOT configurable outlets — the kind of outlet density that matters when a single rack is loaded with servers, switches, and out-of-band management gear on separate circuits. The C2WG36TE-DCMFAM66 (often searched as C2WG36TE DCMFAM66) targets facilities teams who need remote outlet switching and real load visibility, not just a passive strip.
Overview
This PDU pulls 30A (24A rated continuous) through a NEMA L15-30P input plug and distributes it across 36 outlets rated at up to 12A at 208V line-to-line for the C13 positions and up to 16A for the Cx positions. That headroom matters in mixed-equipment racks: you can put high-draw PDUs or blade chassis on the 16A-capable outlets and lighter switching gear on the standard runs without recalculating breaker math for every device swap. Branch circuit breakers are set at 16A max with a 10 kAIC interrupt rating, which is the number an electrical inspector or facilities engineer will actually ask for on a data center build-out.
Key Features
- HDOT configurable outlets: The 36 outlets support Server Technology's High Density Outlet Technology, which lets you reconfigure outlet types in the field rather than ordering a new unit when your rack mix changes.
- 8.6kW input power capacity at 208V 3-phase: Enough headroom for dense server or network racks without derating mid-cycle — sized so you're not tripping breakers on a fully loaded cabinet.
- 30A input at NEMA L15-30P, 24A rated current: Matches standard 3-phase delta whip infeed common in colo and enterprise data center rooms, so electricians aren't improvising a plug adapter.
- 10 kAIC branch circuit interrupt rating: Protects downstream equipment and simplifies the fault-current calculation facilities teams need for panel schedule documentation.
- Gigabit Ethernet management (10/100/1000 Mbps): Fast enough for SNMP polling and web UI access across a full rack row without becoming the bottleneck on your out-of-band network.
- Quiescent power draw under 10W: The PDU's own overhead barely registers against an 8.6kW load — it isn't competing with your IT equipment for capacity.
- 0°C to 60°C operating range: Rated for non-climate-controlled spaces (industrial floors, remote telecom huts) as well as standard data center rooms, with 8%RH to 90%RH humidity tolerance covering most facility conditions.
- -30°C to 80°C storage range: Wide margin for staging in unconditioned warehouses before deployment, without derating the unit on install.
- 70-inch zero-U form factor (2.2in x 2.5in cross-section): Mounts vertically along the rear rail without consuming U-space you'd otherwise use for servers or network video recorders and other rack-mounted appliances.
- UL 62368-1 and CSA C22.2 No. 62368-1 certified: The current safety standard for IT equipment power, relevant for facilities that require updated compliance documentation over the older UL 60950-1.
- FCC Part 15 Class A and CAN ICES-003 Class A: Cleared for commercial and industrial electromagnetic environments — not intended for residential installs, which is standard for this equipment class.
Integration & Compatibility
The C2WG36TE-DCMFAM66's Ethernet management port integrates into standard SNMP-based data center infrastructure monitoring, letting facilities and network teams pull outlet-level status alongside their existing network switches and environmental sensors on the same management VLAN. Planning a mixed 1U/2U rack build is easier when you separate power planning from device planning — see the PoE and power planning guide for load balancing across zero-U PDUs and rack-mount equipment. Because this is a switched unit rather than a basic PDU, pair it with remote KVM or DCIM tooling where outlet-level power cycling on hung equipment saves a truck roll. For broader Server Technology PDU options, the family spans metered, switched, and switched+metered models at different outlet counts and phase configurations within the same power distribution units category — useful if 36 outlets is more or less than your rack actually needs.
Frequently Asked Questions
Q: What input voltage and plug does the C2WG36TE-DCMFAM66 use?
A: It runs on 208V 3-phase delta power at 50/60 Hz, terminating in a NEMA L15-30P plug rated for 30A input (24A rated current).
Q: How many outlets does the C2WG36TE-DCMFAM66 have and what's the rating?
A: 36 HDOT configurable outlets. C13-type positions are rated up to 12A at 208V line-to-line, and Cx-type positions up to 16A at 208V line-to-line.
Q: Can the C2WG36TE-DCMFAM66 be remotely monitored or switched?
A: Yes — it includes Ethernet management at 10/100/1000 Mbps for network-based access as a switched PDU.
Q: What's the warranty on the C2WG36TE-DCMFAM66?
A: It carries a 2-year limited manufacturer warranty.
Q: What operating environment is the C2WG36TE-DCMFAM66 rated for?
A: 0°C to 60°C operating temperature and 8%RH to 90%RH humidity, with a -30°C to 80°C storage temperature range.
Q: What safety certifications does the C2WG36TE-DCMFAM66 carry?
A: UL 62368-1, CSA C22.2 No. 62368-1, FCC Part 15 Class A, and CAN ICES-003 Class A.

I spec a lot of zero-U PDUs for data center rack builds, and the first thing I check on the C2WG36TE-DCMFAM66 is the split outlet rating — 12A on the C13 positions versus 16A on the Cx positions at 208V L-L. That's not a cosmetic detail; it tells you exactly which outlets can carry a high-draw blade chassis and which are meant for standard 1U gear.
Technical Highlights:
- 8.6kW input capacity at 30A/208V 3-phase: Sized to run a fully populated rack without hitting the 24A rated current ceiling under normal load, giving you real headroom instead of a paper spec.
- 10 kAIC branch circuit interrupt rating: This is the number your electrical inspector will want on the panel schedule — it's a meaningful fault-current spec, not boilerplate.
- Quiescent draw under 10W: Against an 8.6kW budget, the PDU's own consumption is background noise — you're not losing usable rack capacity to the management electronics.
Deployment Considerations:
- The 70-inch zero-U chassis mounts vertically in the rear rail channel — confirm your cabinet has rear vertical mounting space before ordering, since this isn't a horizontal 1U/2U strip.
- Gigabit management Ethernet is useful for SNMP polling, but the 0°C to 60°C operating range means this unit is not meant for outdoor or unconditioned extreme-cold enclosures — check ambient conditions if it's going anywhere other than a standard data center room.
This is the right call for a colo or enterprise data center row standardizing on 3-phase delta infeed with mixed 1U/high-draw equipment in the same cabinet — the C2WG36TE-DCMFAM66's configurable outlet mix means you're not ordering a different SKU every time the rack's equipment list changes.
Compare with similar
Server Technology Switched Pops Master PRO2 - C2WG36TE-DCMFAM66
Build Your Complete System
Manufacturer-verified compatible cameras, recorders, mounts, accessories, and licenses for this product. Adjust quantities and add the entire bundle to your cart in one click.
Looking for more Server Technology products? Shop the full Server Technology catalog →
System Design, Deployment & Technical Support
Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.
Fixed scope • Fixed price
System Design Assistance
- Get help validating product compatibility
- Coverage requirements
- Storage planning and deployment architecture before you buy.
Deployment & Configuration Support
- Access fixed-scope support for rollout planning
- User setup guidance
- Migration and system standardization across single-site or multi-site deployments
Guides, Tools & Calculators
- PoE requirements
- Storage retention
- Camera selection and deployment methodology