Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

Vertiv PD3-001 3-Phase Power Output Distribution POD

Overview

The Vertiv PD3-001 is a three-phase power output distribution unit (POD) engineered to work directly with the Liebert ITA2 UPS system via the ITA2 MBC (Main Bypass Cabinet). Rather than running individual branch circuits to every rack PDU, the PD3-001 provides two NEMA L21-30R cord-and-plug connection points that let you distribute three-phase power to downstream rack PDUs cleanly and directly — reducing conduit runs and field wiring labor on the initial installation. It is available as part of the broader power distribution line from Vertiv, a brand known for data center and critical infrastructure power equipment.

Key Features

  • Two NEMA L21-30R Output Receptacles: The L21-30R is a locking 30A three-phase connector — the standard interface for connecting downstream rack PDUs in high-density data center rows. Two receptacles per POD means you can feed two separate rack PDU legs from a single unit, simplifying cable management without sacrificing phase separation.
  • Three-Phase Phase Balancing: The PD3-001 is specifically designed to help balance connected equipment loads across all three phases of the upstream UPS. Unbalanced three-phase loads are a common cause of unexpected UPS derating and nuisance trips — having a structured POD layer makes phase balancing a planned part of the architecture rather than an afterthought.
  • Rack-Mountable Form Factor: At 10.22 lbs, the PD3-001 installs directly in a standard equipment rack. Keeping the distribution point rack-mounted rather than floor-mounted reduces the risk of accidental disconnection and keeps cable runs short between the POD and the PDUs it feeds.
  • Direct Cord-and-Plug Connectivity: By accepting standard cord-and-plug connections to downstream rack PDUs, the PD3-001 eliminates hardwired branch circuit terminations at the rack level. This matters when you need to move or swap PDUs during a refresh cycle — unplug and reconnect rather than calling an electrician.
  • ITA2 MBC Integration: This unit requires the Liebert ITA2 Main Bypass Cabinet for proper operation. It is not a standalone PDU — it functions as the output distribution stage of a larger ITA2 three-phase UPS architecture, which means installation planning should confirm MBC availability before procurement.
  • Small Footprint, Lower Installation Cost: Consolidating the distribution function into a rack-mounted POD reduces the number of electrical termination points in the field, which directly lowers installation labor costs and the time an electrician spends in the power chain.

Integration and Compatibility

The PD3-001 is designed exclusively for use with the Vertiv Liebert ITA2 three-phase UPS platform and requires the ITA2 MBC. Downstream, it feeds standard NEMA L21-30R-compatible rack PDUs. Before specifying this unit, confirm that your ITA2 MBC is on-site and properly commissioned — the POD has no standalone operating mode. Consult your power distribution planning layout to verify phase load assignments across all POD connections before energizing.

Frequently Asked Questions

Q: Does the PD3-001 work as a standalone PDU without the ITA2 UPS system?

A: No. The PD3-001 requires the Liebert ITA2 Main Bypass Cabinet (MBC) for operation. It is the output distribution stage of the ITA2 three-phase UPS architecture, not an independent PDU.

Q: What connector type does the PD3-001 provide for downstream connections?

A: The PD3-001 provides two NEMA L21-30R locking receptacles, which are the standard 30A three-phase connectors used to feed downstream rack PDUs in data center and critical infrastructure environments.

Q: Can the PD3-001 be rack-mounted?

A: Yes, the PD3-001 is designed for rack-mount installation and weighs 10.22 lbs.

Q: What is the purpose of the PD3-001 in a three-phase UPS deployment?

A: The PD3-001 distributes three-phase power from the ITA2 UPS to downstream rack PDUs via cord-and-plug connections, and is specifically designed to help balance connected equipment loads across all three phases of the UPS — reducing the risk of phase imbalance and UPS derating.

Q: How many output receptacles does the PD3-001 have?

A: The PD3-001 has two NEMA L21-30R output receptacles.

Jerry Tildsen
Jerry Tildsen

The PD3-001 is one of those units that only makes sense once you understand the ITA2 architecture it belongs to. As the output POD for the Liebert ITA2 three-phase UPS, it provides the final cord-and-plug distribution layer — specifically two NEMA L21-30R receptacles — that lets you connect downstream rack PDUs without running hardwired branch circuits to each cabinet. That single architectural decision is what keeps installation cost and future PDU swaps manageable.

Technical Highlights:

  • NEMA L21-30R Receptacles: Two locking 30A three-phase outlets cover the standard rack PDU interface for most data center-grade PDUs in this power class — no adapters, no custom whips.
  • Phase Balancing Design: The POD layer exists specifically to give installers a structured way to assign load across UPS phases. Skipping this step and daisy-chaining off one phase is a common field mistake that triggers premature UPS derating under full load.
  • Rack-Mountable at 10.22 lbs: Light enough for a two-person rack install without a lift, but confirm your rack's PDU mounting rail depth before ordering — the PD3-001 has no published depth dimension in current evidence.

Deployment Considerations:

  • This unit requires the Liebert ITA2 Main Bypass Cabinet — verify MBC is on-site and commissioned before scheduling the POD installation. The PD3-001 has no standalone power mode and will not function independently.
  • Dimensions are not published in current evidence (listed as 0.00 x 0.00 x 0.00 in the source data) — contact Vertiv directly or check the ITA2 MBC installation manual for rack unit height and depth before rack planning.

The PD3-001 is the right call for ITA2-based three-phase deployments in colocation rows or enterprise data halls where phase-balanced cord-and-plug distribution to rack PDUs is the design requirement — and where the alternative (individual hardwired branch circuits per rack) would add significant electrical labor cost to the build-out.

Specifications
Product Name: Liebert PD3-001 2-Outlets PDU
Output Receptacles: 2 x NEMA L21-30R
Mounting Type: Rack-mountable
Weight: 10.22 lbs
Dimensions: 0.00 x 0.00 x 0.00 in
Q&A
Reviews
Have Questions?

Vertiv ITA2 3-PH POD with (2) L21-30R - PD3-001

$1,012.00
$693.99

RELATED PRODUCTS

System Design, Deployment & Technical Support

Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

Fixed scope • Fixed price

System Design Assistance

  • Get help validating product compatibility
  • Coverage requirements
  • Storage planning and deployment architecture before you buy.
Request Design Help

Deployment & Configuration Support

  • Access fixed-scope support for rollout planning
  • User setup guidance
  • Migration and system standardization across single-site or multi-site deployments
View Support Services

Guides, Tools & Calculators

  • PoE requirements
  • Storage retention
  • Camera selection and deployment methodology
Open Technical Resources