Product images are provided for reference and may not represent the exact model, configuration, or included components.

Overview

SKU: P59419-B21
UPC: 190017642512
Condition: New
Write a Review 3% OFF

Hpe/en G3 MS 3PW 22KVA FHD WW PDU - P59419-B21

HPE P59419-B21 22kVA 3-Phase PDU Overview The HPE G3 22kVA 3-Phase PDU (P59419-B21) is engineered for high-density rack deployments where consistent, …

$6,650.00 $6,460.99 SAVE $189
Ships same business day
In stock

Quantity:

Adding to cart… The item has been added
Compatibility guidance available for your deployment
Senior specialists for pre and post-sales support
Authorized sourcing and documentation support
Shipping and lead-time confirmation before install

Laura Bennett, IPSD Senior Specialist

Talk to Laura

200+ hrs training • U.S - based

Senior Specialist • 877-277-7147

Hpe/en G3 MS 3PW 22KVA FHD WW PDU - P59419-B21

$6,650.00
$6,460.99

Overview

SKU: P59419-B21
UPC: 190017642512
Condition: New

No Bots, Just Experts

Questions about this product? Free pre-sales support from a senior specialist — product questions, compatibility checks, BOM quotes, price confirmation — typically answered within one business day. Need camera placement or system design work? Engineering time is $175 per hour (qty 1 = 1 hour). Hardware buyers get up to one hour ($175) credited back on their order.

Description

HPE P59419-B21 22kVA 3-Phase PDU

Overview

The HPE G3 22kVA 3-Phase PDU (P59419-B21) is engineered for high-density rack deployments where consistent, reliable power delivery is critical. This unit is designed to support demanding IT infrastructure, ensuring that servers, network equipment, and storage arrays receive stable power. Its 22kVA capacity is suitable for environments requiring significant power per rack, such as enterprise data centers or colocation facilities. The P59419-B21 simplifies power management in complex rack configurations.

Compatibility

This PDU is designed to integrate with standard 19-inch server racks. It is compatible with HPE's G3 rack infrastructure and other enterprise-grade rack systems. Specific compatibility extends to HPE ProLiant DL servers, Synergy compute modules, and various HPE storage solutions that require robust 3-phase power input. It is suitable for environments utilizing standard rack-mount IT equipment from major manufacturers.

Installation Notes

Requires a 3-phase power input connection. Ensure the facility's electrical system can support the 22kVA load. Proper grounding is essential for safe operation and equipment protection. Installation should be performed by qualified electricians familiar with data center power distribution units. Verify outlet configurations match the PDU's input requirements before installation.

What's in the Box

  • 1x HPE G3 22kVA 3-Phase PDU
  • 1x Power Cord
  • 1x Installation Guide
Q&A
Reviews
Have Questions?

RELATED PRODUCTS

System Design, Deployment & Technical Support

Support services and planning resources for commercial surveillance, access control, and infrastructure deployments.

Fixed scope • Fixed price

System Design Assistance

  • Get help validating product compatibility
  • Coverage requirements
  • Storage planning and deployment architecture before you buy.
Request Design Help

Deployment & Configuration Support

  • Access fixed-scope support for rollout planning
  • User setup guidance
  • Migration and system standardization across single-site or multi-site deployments
View Support Services

Guides, Tools & Calculators

  • PoE requirements
  • Storage retention
  • Camera selection and deployment methodology
Open Technical Resources